Calculate how many tonnes of asphalt you need for a road, car park or driveway, the number of truckloads, and the litres of prime coat and tack coat.

How asphalt tonnage is calculated

Tonnes = area × compacted thickness × compacted density. A road 100 m long and 7.3 m wide with a 50 mm wearing course is 730 m² × 0.05 m = 36.5 m³. At 2.35 t/m³ that is about 85.8 tonnes, before wastage.

Prime coat and tack coat

Prime coat is sprayed on the granular base before the first asphalt layer. Tack coat bonds one asphalt layer to the next. The rates in the calculator are typical starting values; always use the rates in your project specification.

Frequently asked questions

How is asphalt measured in a BOQ?

Usually by area (m²) for each layer and thickness, and sometimes by weight (tonnes). Check the method of measurement and the BOQ preambles for your project.

What density should I use?

Dense asphalt is typically 2.3 to 2.4 t/m³ when compacted. Use the density from the approved mix design.

Want to measure and price these items properly? Our practical courses show you how to take off quantities from real drawings and build a full BOQ: Road and Infrastructure Quantity Surveying, Bridge Pier Bar Bending Schedule (free) and all courses.

More free tools: all construction calculators.